Summer construction to block Student Center south entrance

Facilities Planning and Management announced plans for reconstruction at the L.A. Pittenger Student Center to begin May 10 and go through July 30.

During this time, the south entrance to the Student Center will be closed for reconstruction of the steps, ramps and sidewalks leading to the entrance. The west, north and east entrances will remain open during this time.

The entrance into Telephone and Postal Services located at 321 N. College Ave. will remain open.

Access to the main dock, located along the southwest corner of the building, will be limited, and at times it will be closed. Access to the north side of the building will be limited at times as well.

The general parking lots G8 and G9 located along the west and east sides of the building will remain open. Students should access the G8 parking lot from Talley Avenue onto North Street. Students should access the G9 east parking lot from McKinley Avenue onto North Street.


Comments

More from The Daily






Loading Recent Classifieds...